1 |
. 3GPP TR 25.913 V7.1.0. Requirements for evolved UTRA and evolved UTRAN, June 2005
|
2 |
. 3GPP TR 25.814 V0.3.1.Physical layer aspects for evolved UTRA, Oc-tober 2005
|
3 |
. 3GPP R1-050764. Inter-cell interference handling for E-UTRA Ericsson, 3GPP TSG-RAN WG1#42, London,UK, Aug/Sept 2005
|
4 |
. 3GPP R1-050507.Soft frequency reuse scheme for UTRAN LTE.Huawei, 3GPP RAN WG1#41, Athens,Greece, May 2005
|
5 |
. 3GPP R1-050407. Interference coordination in new OFDM DL air inter-face.Alcatel,3GPP RAN WG1#41, Athens,Greece, May 2005
|
6 |
. 3GPP R1-050738.Interference mitigation -!considerations and results on frequency reuse. Siemens,3GPP RAN WG1#42, London,UK, Aug/Sept 2005
|
7 |
. 3GPP R1-050833.Interference mitigation in evolved UTRA/UTRAN. LG Electronics,3GPP RAN WG1#42, London,UK, Aug/Sept 2005
|
8 |
. 3GPP R1-051341.Flexible fractional frequency reuse approach.Sam-sung,3GPP RAN WG1#43, Seoul,Korea, November 2005
|
9 |
. 3GPP R1-051059. Inter-cell interference mitigation for EUTRA. Texas Instruments,3GPP RAN WG1#42bis, San Diego,California,US, Octo-ber 2005
|
10 |
. 3GPP R1-051312. Performance of inter-cell interference mitigation with semi-static frequency planning for EUTRA downlink. Texas Instru-ments,3GPP RAN WG1#43, Seoul,Korea, November 2005
|
11 |
. 3GPP R1-051396. Comparison of bit repetition and symbol repetition forinter-cell interference mitigation. Panasonic,3GPP RAN WG1#43, Seoul,Korea, November 2005
|
12 |
Beckmann D , Killat U , A new strategy for the application of genetic al-gorithms to the channel assignment problem. IEEE Trans Veh Technol, 1999 48(4)
|
13 |
Cheng M M L , Chuang J C I . Performance evaluation of distributed measurement-based dynamic channel assignment in local wireless sys-tems. IEEE J Select Areas Commun, 1996 (5)
|
14 |
. 3GPP R1-051137. Further results on inter-cell interference mitigation based on IDMA. 3GPP RAN WG1 #42bis, San Diego, California, US, October 2005
|
15 |
. 3GPP R1-051085. Resource allocation for interference mitigation with symbol repetition in E-UTRA downlink. ETRI,3GPP RAN WG1#42bis, San Diego,California,US, October 2005
|
16 |
. 3GPP R1-050808.Inter-cell interference management in practical. ETRI,3GPP RAN WG1#42, London,UK, Aug/Sept 2005
|
17 |
. 3GPP R1-050593.Interference coordination for evolved UTRA uplink access.Alcatel, 3GPP RAN WG1 Ad Hoc on LTE, Sophia Antipolis, France, June 2005
|
18 |
. 3GPP R1-051051. Standard aspects of interference coordination for EU-TRA. LG Electronics,3GPP RAN WG1 #42bis, San Diego, California, US, October 2005
|
19 |
. 3GPP R1-060416.Combining inter-cell-interference co-ordination/avoid-ance with cancellation in downlink and TP. RITT,Huawei,CATT,3GPP RAN WG1#44, Denver,USA, Feb 2006
|
20 |
. 3GPP R1-060518. TP for combining beam-forming with other inter-cell interference mitigation approaches. CATT, RITT, 3GPP RAN WG1 #44, Denver,USA, Feb 2006
|
21 |
. 3GPP R1-060517.Further analysis of the performance of inter-cell inter-ference mitigation with beam-forming. CATT,3GPP RAN WG1 #44, Denver,USA, Feb 2006
|
22 |
. 3GPP TS 23.107.QoS concept and architecture, Dec 2003
|
23 |
. 3GPP R1-060822.Precoding and multiuser MIMO. Huawei,3GPP RAN WG1#44bis, Athens,Greece, March 2006
|