大数据 ›› 2023, Vol. 9 ›› Issue (5): 32-47.doi: 10.11959/j.issn.2096-0271.2023057

• 专题:东数西算 • 上一篇    

“东数西算”成渝枢纽战略分析和示范落地

张自力1, 解婷2, 李文平3   

  1. 1 西南大学计算机与信息科学学院软件学院,重庆 400715
    2 重庆工商大学管理科学与工程学院,重庆 400067
    3 重庆大学经济与工商管理学院,重庆 400044
  • 出版日期:2023-09-01 发布日期:2023-09-01
  • 作者简介:张自力(1964- ),男,博士,西南大学计算机与信息科学学院教授、学术委员会主任,西部(重庆)科学城先进数据中心主任。中国计算机学会(CCF)理事,CCF大数据专家委员会执行委员,中国人工智能学会知识工程与分布智能专业委员会常委,重庆计算机学会副理事长,四川省人工智能学会副理事长。主要研究方向为人工智能、分布式计算、大数据分析
    解婷(1990- ),女,博士,重庆工商大学管理科学与工程学院讲师,主要研究方向为供应链管理、电子商务运营
    李文平(1989- ),女,重庆大学经济与工商管理学院博士生,主要研究方向为信息管理、供应链管理

National computing hub built in Chengdu-Chongqing economic circle boosts China’s “Channel Computing Resources from the East to the West” project

Zili ZHANG1, Ting XIE2, Wenping LI3   

  1. 1 College of Computer and Information Science, College of Software, Southwest University, Chongqing 400715, China
    2 School of Management Science and Engineering, Chongqing Technology and Business University, Chongqing 400067, China
    3 School of Economics and Business Administration, Chongqing University, Chongqing 400044, China
  • Online:2023-09-01 Published:2023-09-01

摘要:

数字经济时代,算力已成为衡量国家经济发展程度的重要指标。通过对“东数西算”和“成渝地区双城经济圈建设”两大国家战略进行剖析,并结合“东数西算”成渝枢纽节点建设情况,提出成渝枢纽节点之所以被布局为东部枢纽节点之一,主要得益于算力战略区位优势、数据融通体系保障、算力基础设施夯实、算力应用场景成熟四方面原因。进一步,以西部(重庆)科学城先进数据中心为例,剖析了“东数西算”在成渝地区的示范落地,并提出为更好地发挥成渝枢纽节点的作用,一方面成渝枢纽内天府、重庆数据中心集群可从网络、数据、算力、产业、算法、能源六方面搭建协同机制;另一方面,成渝枢纽也可与贵州枢纽节点从算力业务分配、数据要素跨域流通以及探索数字合作新业态三方面进行协同。

关键词: 数字经济, 东数西算, 成渝枢纽, 协同发展

Abstract:

In the era of the digitaleconomic, computing power has become an important indicator to measure the degree of national economic development.With analyzing the two national strategies of "Channel Computing Resources from the East to the West" progect and "Construction of Chengdu-Chongqing Economic Circle", and based on the construction of Chengdu-Chongqing Hub Node, the reasons that why Chengdu-Chongqing hub node has been laid out as one of the eastern hub nodes were analyzed.It due to four aspects, namely, strategic location advantage of computing, data integration system guarantee, computing infrastructure compaction, and maturity of computing application scenarios.Further, the operations in the advanced data center of Western (Chongqing) Science City demonstrate that the nationalcomputing hub built in Chengdu-Chongqing economic circle boosts the project that channels computing resources from the east to the west.Then the paper discussed the coordinated development between Tianfu data center cluster and Chongqing data center cluster, as well as the coordinated development between national computing hub built in Chengdu-Chongqing economic circle and national computing hub built in Guizhou province.It suggested that Tianfu data center cluster and Chongqing data center cluster should build coordination mechanisms from six aspects, including the network, data, computing power, industry, algorithm and energy.The neighboring national computing hubs can implement coordination based on the allocation of computing power business, the cross-domain circulation of data elements, and new business formats for digital cooperation.

Key words: digital economy, Channel Computing Resources from the East to the West, national computing hub built in ChengduChongqing economic circle, coordinated development

中图分类号: 

No Suggested Reading articles found!