[1] |
MCKEOWN N , ANDERSON T , BALAKRISHNAN H ,et al. OpenFlow[J]. ACM SIGCOMM Computer Communication Review, 2008,38(2): 69-74.
|
[2] |
胡骞, 赵国永, 霍晓莉 ,等. 灰盒光传输设备的 SDN 管控技术研究及应用[J]. 电信科学, 2021,37(12): 93-100.
|
|
HU Q , ZHAO G Y , HUO X L ,et al. Application and research of SDN-based management and control technology for optical transport grey-box devices[J]. Telecommunications Science, 2021,37(12): 93-100.
|
[3] |
胡骞, 张安旭, 霍晓莉 . “灰盒”模式构建数据中心光层互联[J]. 通信世界, 2019(33): 34-35.
|
|
HU Q , ZHANG A X , HUO X L . Construction of optical layer interconnection of data centers based on “grey box” mode[J]. Communications World, 2019(33): 34-35.
|
[4] |
中华人民共和国工业和信息化部. 软件定义光传送网:YD/T 3417—2018[S]. 北京:人民邮电出版社, 2018.
|
|
Ministry of Industry and Information of the People's Republic of China. Technical requirements of intermediate-controller plane interface for software.Defined optical transport network(SDOTN):YD/T 3417—2018[S]. Beijing:Posts & Telecom Press, 2018.
|
[5] |
中华人民共和国工业和信息化部. 接入型光传送网:YD/T 3843—2021[S]. 北京:人民邮电出版社, 2021.
|
|
Ministry of Industry and Information of the People's Republic of China. Technical requirements for access equipment of optical transport network (OTN):YD/T 3843-2021:YD/T 3843—2021[S]. Beijing:Posts & Telecom Press, 2021.
|
[6] |
CCSA. 接入型光传送网(OTN)设备管控技术要求报批稿:YD/T 1216-2019[S]. 2020.
|
|
CCSA. Technical requirements of management and control for access OTN equipment:YD/T 1216-2019[S]. 2020.
|
[7] |
IEEE. Station and Media Access Control Connectivity Discovery:802.1ab[S]. 2005.
|
[8] |
ITU-T. Protocol for automatic discovery in transport networks:G.7714.1[S]. 2017.
|
[9] |
ITU-T. Interfaces for the optical transport network:G.709[S]. 2020.
|
[10] |
刘昊, 李俊杰, 霍晓莉 ,等. 调顶信号传输控制方法、装置、系统和多通道光模块[P]. 中国:CN114499738A. 2022.
|
|
LIU H , LI J J , HUO X L ,et al. Transmission and control method,device,system of pilot tone signals and multi-channel optical modules[P]. China:CN114499738A. 2022.
|
[11] |
CCSA. 城域N×25 Gbit/s波分复用(WDM)系统技术要求-第1部分:总体技术要求:YD/T 4013.1-2022[S]. 2022.
|
|
CCSA. Technical requirements of metro N×25 Gbit/s WDM systems-part 1:general technical requirements:YD/T 4013.12022[S]. 2022.
|
[12] |
CCSA. 城域N×25 Gbit/s WDM系统技术要求-第3部分:LWDM报批稿[S]. 2022.
|
|
CCSA. Technical requirements of metro N×25 Gbit/s WDM systems-Part 3:LWDM[S]. 2022.
|
[13] |
中华人民共和国工业和信息化部. 25 GB/s 波分复用:YD/T 4019.2—2022[S]. 北京:人民邮电出版社, 2022.
|
|
Ministry of Industry and Information of the People’s Republic of China. 25GB/s wavelength division multiplexing (WDM) optical transceiver-Part2:LWDM:YD/T 4019.2-2022[S]. Beijing:Posts & Telecom Press, 2022.
|
[14] |
吴家祺, 张俊, 洪仕海 ,等. 一种基于Telemetry技术的PON网络误码秒级监控应用方法[J]. 通信世界, 2021(4): 47-48.
|
|
WU J Q , ZHANG J , HONG S H ,et al. A second responsiveness error code monitoring method of PON network based on Telemetry technology[J]. Communications World, 2021(4): 47-48.
|
[15] |
中国电信集团有限公司. 全光网2.0技术白皮书[R]. 2021.
|
|
China Telecom Group Co.,Ltd.. All-optical network 2.0 technical white paper[R]. 2021.
|