[1] |
王玮 . 企业信息化绩效评价[D]. 武汉:湖北工业大学, 2008: 1-6.
|
|
WANG W . Performance evaluation of enterprise informatization[D]. Wuhan:Hubei University of Technology, 2008: 1-6.
|
[2] |
国家电网公司.国家电网公司信息化企业标准(试行版)[S].2013: 7-21.
|
|
Grid State. Grid State informatization enterprise standard (trial version)[S]. 2013: 7-21.
|
[3] |
国家电网公司.国家电网公司“十二五”信息化规划[R].2010: 42-45.
|
|
Grid State. State Grid “12th Five-Year” informatization planning[R]. 2010: 42-45.
|
[4] |
中国南方电网有限责任公司.中国南方电网有限责任公司“十二五”信息化规划[R].2010: 15-27.
|
|
China Southern Power Grid Company Limited. China Southern Power Grid Company Limited “12th Five-Year” informatization planning[R]. 2010: 15-27.
|
[5] |
郭瑞兵 . 企业信息化经济效益评价指标体系研究[D]. 北京:北京交通大学, 2007: 29-48.
|
|
GUO R B . Research on economic benefit evaluation index system of enterprise informatization[D]. Beijing:Beijing Jiaotong University, 2007: 29-48.
|
[6] |
中华人民共和国工业和信息化部. 工业企业“信息化和工业化融合”评估规范(2011-11-09)[2017-02-11][EB/OL]. .
|
|
Ministry of Industry and Information Technology of People’s Republic of China.Evaluation standard of “integration of informatization and industrialization in industrial enterprises”(2011-11-09)[2017-02-11][EB/OL]..
|
[7] |
雷振江, 吕旭明, 丛培贤 ,等. 电网企业信息化建设成效评估方法研究[J]. 信息通信技术, 2016,14(1): 58-60.
|
|
LEI Z J , LV X M , CONG P X ,et al. Effectiveness evaluation method of power grid enterprise informatization construction[J]. Information and Communication Technology, 2016,14(1): 58-60.
|
[8] |
苏发 . 新兴发电集团企业信息化建设思路[J]. 电力信息化, 2004,2(8): 15-16.
|
|
SU F . Thoughts on informatization construction of emerging power generation enterprises[J]. Power Informatization, 2004,2(8): 15-16.
|